Article

Winnipeg Bridge Construction

0 78 Infrastructure

by Journal Of Commerce

Flood water levels on the Red River are receding at the construction site, east of Letellier, MB, where a new bridge connecting Provincial Road 201 with Highway 75 is being built in the shadow of the old span
Letellier Bridge
Letellier Bridge

CHRISTOPHER FRIESEN

Flood water levels on the Red River are receding at the construction site, east of Letellier, MB, where a new bridge connecting Provincial Road 201 with Highway 75 is being built in the shadow of the old span.

Bridge construction and associated roadwork are expected to be completed later this year. Ruskin Construction is the general contractor for this $35,000,000 project jointly funded by the Provincial and Federal Governments through the Infrastructure Stimulus Fund.

Leave a comment

Or register to be able to comment.

Copyright ConstructConnect TM. All rights reserved. "ConstructConnect" is a dba for CMD Holdings.
The following rules apply to the use of this site:
Terms of Use and Privacy Statement