May 22, 2009
Waterloo, ON
Waterloo partnership seeks LEED Silver for West Side Family YMCA and District Library
The YMCA of Kitchener-Waterloo, City of Waterloo and Waterloo Public Library are partnering to build and own a new library and YMCA on Laurelwood Drive at Fischer-Hallman Road in Waterloo.
The Waterloo West Side Family YMCA and Library, a 65,000-square-foot, two-storey building, will cost approximately $17 million to build. The facility’s ownership and design teams will aim for LEED Silver certification.
The new facility will offer these features:
• Four-lane lap pool with swirl pool and recreation pool attached
• Gym
• Dance studio and fitness area
• Change rooms
• Public washrooms
• Community room
• Multi-purpose rooms
• Indoor track
• Common foyer
• Administration, reception and staff space
• Shared mechanical and electrical systems.
LEED aspects under consideration include energy-efficient cladding and fixtures and highly reflective membrane roofing. The block and steel-framed building will also include one level of underground parking and will use interior materials such as athletic, gymnasium, recreational and therapeutic surfaces, flooring and equipment.
The library is expected to include the following features:
• 100,000-item collection contained in library casework;
• Family literacy enhancement materials;
• Life-long learning materials;
• Teen areas;
• Computer technology centre;
• Designated reading area;
• Internet workstations and wireless access;
• Multi-purpose meeting room;
• Quiet study areas; and
• Collaborative work space.
Detailed designs were recently completed and the working drawings are expected to be complete late summer 2009 for tendering. The tender is expected to be issued in September 2009. Construction schedules will be determined once the tender has been issued.
The design team for this project includes the following firms:
• Teeple Architects Inc. (architecture, interior design, landscape plans);
• Garwood-Jones & Hanham Architects (associate architect);
• Halcrow-Yolles (structural engineering);
• Smith & Anderson Consulting Engineering (mechanical and electrical engineering);
• Enermodal Engineering (LEED accredited professional); and
• IBI Group (civil).
– RCD Digital Media
The information above was current at time of publication. To provide an update on this particular project, please send an email to eteamcanada@reedbusiness.com.
| MOST POPULAR STORIES |
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- TransCanada begins construction on British Columbia-Alberta pipeline
- VIDEO: B.C. Construction Association welcomes standardized contract forms
- Port Mann Bridge under construction
- Crane accident kills worker at construction site in Burnaby, British Columbia
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 263 projects with a total value of $8,919,878,049 that Reed Construction Data Building Reports reported on yesterday.
NATURAL GAS PROCESSING FACILITY
$500,000,000 Fort Nelson BC Prebid
$250,000,000 Fort Nelson BC Negotiated
$35,000,000 Winnipeg MB Prebid
| CURRENT STORIES |
- Crane operator certification deadline looms in British Columbia
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- Saskatoon bridge closed indefinitely over structural concerns
- City of Regina project turns up all sorts of surprises
- Awareness about qualifications-based selection lacking: Survey
- Canadian Institute of Steel Construction launches Steel Day
- Saskatchewan bridge collapses, causing crane to topple
- Crane tips over, killing worker and injuring two
- Saskatoon man pulled from hole at construction site
- Churchill airport gets government cash for infrastructure upgrades
- Stantec acquires health care architectural firm
- Ground broken on Halifax RCMP headquarters
- Fanshawe College’s new Centre for Applied Transportation Technologies goes green
- Vanbots continues work on York University Life Sciences Building in Toronto
- Manitoba introduces new farm building code
- Heavy rains wash away bridges to Nova Scotia fishing village
- South Korea calls for financial safety net
- Jobsite safety a shared duty: Mechanical Contractors Association
- New technology could help find Jimmy Hoffa: Study
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s construction starts in a transition phase (August 27, 2010)
- U.S. initial jobless claims rise to half a million again (August 19, 2010)
- It’s been 35 years since institutional construction starts as strong (August 6, 2010)
- More

















