LATEST NEWS
Water & Wastewater | Engineering | Roadbuilding | Steel | Trade Contracting
February 8, 2010
Trade deal
Canadian construction firms allowed to bid on U.S. stimulus projects
The Canadian Construction industry is welcoming the deal that will allow Canadian companies access to U.S. infrastructure stimulus projects. “It’s a good first step forward,” said Michael Atkinson, president of the Canadian Construction Association.
“We still have a lot of work to do as far as ensuring access for Canadian suppliers to U.S. state procurement. States and provinces are now subject to the procurement code of the WTO (World Trade Organization). What they have done is agree to agree.”
Canada and the U.S. have agreed to offer each other permanent market access at the sub-federal level, under the provisions of the WTO Agreement on Government Procurement (GPA).
“Canadian suppliers of products such as steel and iron, who were (previously) locked out of the U.S. procurement plan will now have access,” said Atkinson. “We are in essence giving them the same access to our provincial projects.”
Canadian companies will now be able to participate in state and local public works projects in 37 states that are funded by the US$787 billion American Recovery and Reinvestment Act (ARRA).
“I expect when further details are nailed down and made available this would be a good thing for us,” said Marv DeVries, president of water-treatment equipment maker Trojan Technologies.
“We are not sure what the impact will be in the short term. It is not clear from anything we have seen what the cut-off point will be for the projects in question.”
The Buy American Act (BAA) has been a particular barrier for the construction of water and waste-treatment facilities, a highly integrated business that uses materials and components made in both countries.
The restrictions have also been applied to Canadian firms owned by U.S. companies, such as Trojan, a manufacturer of water-treatment products based in London, Ont.
It is a wholly owned subsidiary of Washington, D.C.-based Danaher Corp.
Canadian brass manufacturer, Cambridge Brass Inc., has had its pipe fittings that were already installed removed from projects in California – at the company’s expense — as a direct result of the BAA.
The American Recovery and Reinvestment Act is an economic stimulus package approved by the United States Congress in February 2009.
The Buy American Act (BAA) is part of the US$787 billion stimulus package, which barred Canadian contractors and businesses from bidding or supplying materials to new building or renovation projects worth less than US$8.8 million that were funded with money from the bill.
BAA applies if the prime contract is for construction of facilities related to airports, transit systems, highways, bridges, ferries or other transportation infrastructure.
Almost all large transportation contracts in the United States are administered by state, local, or private sector organizations and aren’t covered under free trade deals between Canada and the U.S.
| MOST POPULAR STORIES |
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- TransCanada begins construction on British Columbia-Alberta pipeline
- VIDEO: B.C. Construction Association welcomes standardized contract forms
- Port Mann Bridge under construction
- Crane accident kills worker at construction site in Burnaby, British Columbia
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 263 projects with a total value of $8,919,878,049 that Reed Construction Data Building Reports reported on yesterday.
NATURAL GAS PROCESSING FACILITY
$500,000,000 Fort Nelson BC Prebid
$250,000,000 Fort Nelson BC Negotiated
$35,000,000 Winnipeg MB Prebid
| CURRENT STORIES |
- Crane operator certification deadline looms in British Columbia
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- Saskatoon bridge closed indefinitely over structural concerns
- City of Regina project turns up all sorts of surprises
- Awareness about qualifications-based selection lacking: Survey
- Canadian Institute of Steel Construction launches Steel Day
- Saskatchewan bridge collapses, causing crane to topple
- Crane tips over, killing worker and injuring two
- Saskatoon man pulled from hole at construction site
- Churchill airport gets government cash for infrastructure upgrades
- Stantec acquires health care architectural firm
- Ground broken on Halifax RCMP headquarters
- Fanshawe College’s new Centre for Applied Transportation Technologies goes green
- Vanbots continues work on York University Life Sciences Building in Toronto
- Manitoba introduces new farm building code
- Heavy rains wash away bridges to Nova Scotia fishing village
- South Korea calls for financial safety net
- Jobsite safety a shared duty: Mechanical Contractors Association
- New technology could help find Jimmy Hoffa: Study
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s construction starts in a transition phase (August 27, 2010)
- U.S. initial jobless claims rise to half a million again (August 19, 2010)
- It’s been 35 years since institutional construction starts as strong (August 6, 2010)
- More

















