LATEST NEWS
O H & S
September 3, 2012
Signs to look for in a problem claim
View from the Board | Grant McMillan
Most WorkSafeBC claims are the result of legitimate workplace injuries and diseases. A few, however, will develop into problems.
You may feel that the injury did not happen at work or that it never happened. You may also feel that the worker is dragging out the return to work.
All claims should be investigated immediately and thoroughly, when you first receive the report of the injury.
This requires the following steps:
Ensure that claims are reported promptly to the right person in management. Claims that are questionable in the early stages tend to become both controversial and expensive.
View from the Board
Grant McMillan
Use the standard Employer’s Report of Injury or Occupational Disease (Form 7) and pay close attention to the information it requests.
And remember to file electronically on-line, through the WorkSafeBC web portal. This will get your information in much faster.
Make sure that whoever manages claims for your company understands the problem signs for claims.
Problem claims frequently have a number of common elements.
Read other articles by Grant McMillan
■ What to do at the start of an injury claim
You should watch for these kinds of situations:
The worker states the injury occurred late on Friday or early Monday morning (or after a holiday or long weekend).
There was no witness to the accident.
The worker was about to be laid off.
The worker changes doctors after being told he can return to work.
There are rumours that the worker is working elsewhere or engaging in sports.
The worker has multiple WorkSafeBC claims.
The worker has a poor performance record.
The worker is days late in reporting the injury.
The worker has family problems that cause irregular attendance.
The worker has other personal problems.
The worker is difficult to contact while off on compensation.
The accident description does not seem likely.
There is a poor relationship between worker and supervisor.
There are poor labour relations on the worksite.
The worker has a vague medical diagnosis.
The worker has little or no local support system (family or friends)
If the claim seems questionable, indicate on the Form 7 that you have concerns or don’t agree with the worker’s version. On the electronic Form write “This claim is protested.”
WorkSafeBC must then do its own enquiry as well.
WorkSafeBC is a large organization and its staff have many demands on their time.
If you are professional and persistent, you will get more attention from them than if you don’t show an interest in the claim.
Telephone or fax the case manager if you have immediate concerns.
Always have the claim name and claim number ready to speed identification.
Do not assume that all is going well if you have not heard anything.
The case manager may have 100 to 150 claims at any one time.
If you are not able to reach the case manager within a reasonable time, speak with the case manager’s boss.
Make sure you leave your mobile phone number so you can easily be contacted.
The employer who remains the most active in the claim will get the best result.
Grant McMillan is the president of the Council of Construction Associations (COCA), which represents the interests of 16 construction associations in B.C. on WorkSafeBC matters. Grant is also a member of the Journal of Commerce Editorial Advisory Board. Send comments or questions to editor@journalofcommerce.com.
| MOST POPULAR STORIES |
- Union threatens legal action over allegations of signing apprentices at BCIT
- New partnership to bid on Fort McMurray transmission project
- Industry reacts to surprise B.C. Liberal majority
- VIDEO: Transit-oriented development in Edmonton
- Labour federation takes issue with some political donations in Alberta
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.
$1,000,000,000 Edmonton AB Prebid
$220,000,000 Medicine Hat AB Negotiated
AGRICULTURAL EXHIBITION EXPANSION
$50,000,000 Calgary AB Prebid
| CURRENT STORIES |
- Construction Site Arson
- Industry reacts to surprise B.C. Liberal majority
- Journal of Commerce Update for the week of May 20th, 2013
- Calgary Airport Tunnel
- Worker at centre of union sign up allegations speaks out
- Calgary program aims to get more people into the trades
- Midrise in the City
- Veterans battle barriers into the trades
- Government makes changes to online tendering
- SNC-Lavalin maintains that new bribery allegations have been resolved
- B.C. faces a tough battle for top talent
- Keyano College building state of the art training facility
- Essential skills can play a vital role in an apprentices' success
- Taking a closer look at the risks in green building for contractors
- Colleges conduct construction research in addition to teaching
- Skills Canada BC Competition
- Lower Mainland high school trades program is unique
- Construction Learning Forum aims to educate
- High schools looking for more industry participation
- Industrial construction supervisor program takes off
- Saskatchewan bill passed
- Edmonton garners support for regional cash for arena
- Feds pledge $5 million for Vimy memorial
- VIDEO: Competing in the trades
- Provinces need to loosen up apprenticeship rules
- Way Up on Westwood
- Building Up On Bayview
- Barrie Construction Association rolls with motorcycle ride for cancer
- Vimy Ridge memorial gets new visitor centre
- Minnesota Vikings unveil new multi-use stadium plan
- Proposed Ambassador Bridge twinning draws Windsor mayor’s ire
- Construction on pedestrian tunnel to Billy Bishop Airport continues to make progress
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More









