JOC ARCHIVES

LATEST NEWS  Heavy Equipment

September 26, 2012

Plans for Canada's largest biofuel facility announced

The largest organics biofuel facility in Canada will be built in Surrey, B.C., as a way to divert waste from the landfill and turn it into natural gas.

Mayor Dianne Watts said about a quarter of the facility’s project costs will come from the federal government and that a private partner will be chosen to design, build and operate it by 2015.

The mayor says Surrey collects waste from about 100,000 homes and that about 65 per cent of its residential garbage includes organics from commercial kitchen and yard waste.

City spokeswoman Tara Foslien says that eventually, Surrey aims to be home to North America’s only fully integrated organics waste management system.

It involves organic waste being picked up by a fleet of trucks that transport it to the biofuel facility, where waste will be processed into fuel to power the trucks.

Construction of the facility is expected to start next year.

News from © Canadian Press Enterprises Inc., 2012

Print | Comment

MOST POPULAR STORIES
TODAY’S TOP CONSTRUCTION PROJECTS

These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.

LRT EXTENSIONS

$1,000,000,000 Edmonton AB Prebid

HOSPITAL ADDN, ALTS

$220,000,000 Medicine Hat AB Negotiated

AGRICULTURAL EXHIBITION EXPANSION

$50,000,000 Calgary AB Prebid

Daily Top 10

CURRENT STORIES
ALEX’S ECONOMICS BLOG

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.

TODAY’S TOP JOBS

More jobs 

myJobsite.ca

Your gateway to
the top careers
in construction
and design