| Note: | Project is at the pre-application stage. Preliminary proposal has been submitted to the British Columbia Environmental Assessment Board. Design and construction schedules have yet to be determined. Further update summer 2013. Environmental Regulatory Contact at the Owner: Paul Dormer (403)920-7266, email: paul_dormer@transcanada.com |
| Project: | proposed construction of a 49.8 MW hydroelectric facility on the McGregor River and a 33.2 MW hydroelectric facility on Herrick Creek and approximately 110 kilometres of transmission line connecting the two facilities to each other and to the BCTC grid at the Salmon Valley substation north of Prince George, British Columbia. The two combined facilities would have a total capacity of 83 MW. |
| Scope: | 2 structures |
| Development: | Engineering |
| Category: | Elect power, building; Elect power, engineering |
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Coordinator | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|