| Note: | Project is in early development phase as owner prepares regulatory application for approval to construct and operate the project. Engineering design and construction schedules to be confirmed in summer 2013. Further update at that time. |
| Project: | construction of an oil terminal in Hardisty, AB for the existing Keystone Pipeline System. Proposed capacity is 2.6 million barrels of crude oil bacth accumulation tankage and pipeline infrastructure. |
| Development: | Engineering |
| Category: | Oil refineries; Pipelines; Warehouse, storage bldgs |
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|